
Reduce Construction Costs
- Air conditioning and heating capacity reduced by up to 1/3
- Faster and Easier
- Reduce installation and framing labor
- Eliminate need for wall insulation contractor
- Factory built for less site waste disposal
- No crane or forklift required for installation
Less Callbacks for warranty work
- Factory quality control for straight and square walls
- No warping, splitting or twisting of studs
Subs like it—no studs to drill through
Superior product
Meets or exceeds all building codes
|
|